+ One Platform. Plan It, Build It, Track It.

THE PLAN AND 
THE FIELD, ON THE SAME page

Most contractors run scheduling in one tool, field management in another, and workflows in a third, then spend the whole project reconciling them. Linarc connects all three, so a delay logged on site updates the schedule, triggers the right workflow, and shows up in your forecast before it costs you.

REQUEST DEMO
schedule — LOOKAHEAD
[01]// WHY THIS RELEASE

Deep capability is the floor, not the ceiling.

Every change came from contractors running Linarc on real jobsites.

[02]// WHAT CHANGED

Four changes you will feel on day one.

Linarc was built from the ground up as one connected construction management platform — not assembled from separate tools that force your team to bridge the gaps manually. From the field to the office, it helps you see what is happening, understand what needs attention, and act before risk becomes lost profit.

sharper look-ahead

A sharper look-ahead

+
The next two to three weeks, pulled from the master schedule
+
Constraints, and equipment tagged on the line item
+
The RFIs and submittals holding a task back, in view

Finance that protects margin

+
Change orders update the contract, budgets adjust separately
+
Cost exposure surfaces while you can still act
+
Commitments and Schedules of Values track against the work
change orders update the contract
plans markup

RFIs that carry their own status

+
Draw a shape on the sheet and link it to an RFI
+
A badge changes color as the RFI moves through its states
+
Versioned markups keep the question on the right revision

A native app that works when the signal does not

+
Fully native on iOS and Android, offline-first
+
Clock in, switch tasks, and capture photos with no signal
+
It syncs the moment signal returns
timecard
[03]// ONE CONNECTED PLATFORM

One connectedplatform, from the plan sheet to the ledger.

Information entered once updates everywhere in real time.

+
Field progress drives schedules, project controls, and reporting
+
RFIs, submittals, plan sheets, and field journals stay tied to the work
+
Versioned markups keep the latest sheet the one in effect
+
Field work on mobile flows straight to your ERP
+
Teams coordinate from shared project data, not separate systems
[04]// WHAT IS NEXT

The platform goes further.

As that connected foundation keeps growing, we are building intelligence directly into the platform, the kind that helps teams find answers faster, surface emerging risks earlier, and spend less time hunting for information and more time managing the work. It will not live in a separate tool. It will be part of the platform. We will share more when it is ready.

“Together, these updates reinforce Linarc’s mission to simplify complexity, connect workflows, support teams, and drive measurable results across every phase of construction.”

Shanthi Rajan
Founder and CEO, Linarc

See it
before it ships.

The platform takes its next step July 14. Book a demo and we will walk your team through what changes in navigation, Schedule, Finance, and the field app.

+ One Platform. Plan It, Build It, Track It.

THE PLAN AND 
THE FIELD, ON THE SAME page

Most contractors run scheduling in one tool, field management in another, and workflows in a third, then spend the whole project reconciling them. Linarc connects all three, so a delay logged on site updates the schedule, triggers the right workflow, and shows up in your forecast before it costs you.

REQUEST DEMO
schedule — LOOKAHEAD
[01]// THE PROBLEM

DISCONNECTED TOOLS, 
QUIET LOSSES

Every gap between your tools is a place for delays, rework, and margins to hide. You usually find it too late to fix.

STALE SCHEDULE
A plan that doesn't know what happened in the field is already outdated.
BLIND CREWS
A field team working off last week's plan is building risk into the job.
LOST RECORD
A workflow that lives in email leaves nothing you can trace or defend.
MANUAL RECONCILING
Your team spends the project stitching three tools back together by hand.
By the time the gap shows up, it may already be:
SCHEDULE
SLIPPED
SCOPE
MISSED CHANGE ORDER
CASH FLOW
DELAYED BILLING
BOTTOM LINE
MARGIN YOU CAN'T RECOVER
[02]// THE SHIFT

THREE LAYERS, ONE SYSTEM

Scheduling, jobsite execution, and workflow automation aren't separate products in Linarc. They share the same project data.

01

PLAN
Build the master schedule, WBS, and critical path. Track cost, time, and scope as one metric.

02

BUILD
Push the weekly schedule to crews, capture progress and photos from mobile, and keep the jobsite on the live plan.

03

TRACK
Automate RFIs, change orders, submittals, and punch lists so every process feeds the schedule and budget.
[03]// SCHEDULING

SCHEDULE CERTAINTY,
PLAN TO TASK

A collaborative scheduler built for construction, so everyone works from the same plan, updated in real time.

MASTER & CONTRACTOR SCHEDULES
Plan the WBS and milestones up top. Contractors break work into field tasks that sync progress back automatically.
2 TO 3 WEEK LOOK-AHEADS
Push the next few weeks to foremen so they prioritize achievable work instead of guessing.
RESOURCE-LOADED PLANNING
See the crew and hours each task demands against budget, so you catch an overloaded week before it slips.
PROGRESS BY ACTUAL QUANTITIES
Crews report installed quantities, not gut-feel percentages. Percent complete is calculated from the work actually placed.
CRITICAL PATH & BASELINE
Auto-highlight the critical path, track against baseline, and build recovery schedules when the job moves.
P6 AND BEYOND
Bring schedules from Primavera P6, MS Project, and Excel into a single system with real-time visibility.
[04]// JOBSITE MANAGEMENT

FIELD TO OFFICE,
BOTH WAYS

Pull the schedule, plans, and documents the crew needs. Push progress, photos, and reports back. One connected jobsite, no re-entry.

PLAN MARKUPS & LOCATION PINS
Mark up drawings and pin issues, RFIs, and punch items to an exact spot, not a vague description.
VERSION CONTROL
Upload a new plan set at any time. The field always sees the current sheet, while prior revisions remain archived.
ORGANIC FIELD DATA
Capture progress and event data once, in the field, to trigger workflows and update metrics.
REAL-TIME PREDICTIONS
Field progress feeds live predictions of impact on budget and schedule, so you correct early.
plans — location pins
[05]// WORKFLOWS

AUTOMATE THE WORK
THAT EATS YOUR WEEK

RFIs, change orders, submittals, and punch lists. Standardized, automated, and connected to the rest of the project.

RFI #214 — CREATE → ROUTE → APPROVE → CLOSE → RESOLVED
RFIS, RESOLVED FASTER
Create from anywhere, route through custom flows, and track every RFI to completion with metrics that cut response time.
CHANGE ORDERS WITH IMPACT
Capture change activity in one place and auto-update the schedule and budget on approval.
SUBMITTALS & PUNCH LISTS
Manage submittals from one record. Close out quality items with assigned owners and due dates.
BUILD YOUR OWN
A no-code workflow builder lets your team design custom processes, no developer required.
[06]// BILLING AND COST CONTROL

GET PAID FOR EVERY UNIT
YOU PUT IN PLACE

When the schedule, the field, and the budget share one record, billing stops being a month-end scramble and runs on the progress you already captured.

PROGRESS BILLING ON COMPLETION
Percent complete comes from actual installed quantities, so each period reflects work placed, not estimated.
SOV TO PAY APP TO INVOICE
Cost-loaded schedules auto-generate the SOV, then carry through to pay apps and invoices without rekeying.
WIP, RETAINAGE & CHANGE ORDERS
Track WIP and retainage as the job moves, and roll approved change orders straight into what you bill.
DOCUMENTED, AUDIT-PROTECTED MARGIN
Field records back every billable line, so extra work gets billed instead of absorbed.
[07]// THE CONNECTED ADVANTAGE

WHEN DATA CONNECTS,
RISK SURFACES EARLY

The point isn't five good tools. It's that they run on one live project record.

SEE RISK SOONER
Field progress, schedule, and budget move together, so a slip shows up as a forecast, not a surprise.
CAPTURE ONCE, USE EVERYWHERE
Data captured in the field flows to the schedule, the workflow, the billing, and the report. No re-entry.
ONE RECORD, EVERY STAKEHOLDER
Full visibility; GCs, subs, and owners work from the same project data, from anywhere.
WORKS WITH WHAT YOU RUN.
QUICKBOOKS · SHAREPOINT · SAGE · PRIMAVERA P6 · MS PROJECT · EXCEL
An open, cloud-based platform, with a Report Builder, a 12-week look-ahead planner, and auto-generated daily reports synced to progress, so leadership gets reporting it can rely on.
[08]// PROOF

BUILT FOR HOW CONTRACTORS
REALLY RUN JOBSITES

Connected execution isn't just a feature. It's what moves the schedule, productivity, billing, and margin.

OAC REPORTS IN MINUTES
Connected data becomes decision-ready reporting without manual compilation.
FASTER RFI RESPONSE
Custom flows and metrics cut the time questions sit unanswered.
CHANGE ORDERS DOCUMENTED
Field records and approvals captured to protect billable work.
ONE LIVE PROJECT RECORD
Field, office, and leadership working from the same live data.
[09]// THE PLAN

THREE STEPS TO CONNECTED CONTROL

You don't need another disconnected tool or a drawn-out overhaul. Just full project visibility in one connected view.

01

SEE LINARC IN ACTION
See how schedules, the field, and workflows connect into one view of performance and risk.

02

BUILD THE RIGHT ROLLOUT
Start where connected data cuts the most manual work and strengthens documentation first.

03

RUN PROJECTS WITH BETTER VISIBILITY
Give field and office one platform to surface issues sooner and protect profit.

STOP RECONCILING TOOLS. START CONNECTING THEM.

REQUEST DEMO
[10]// TAKE CONTROL

PLAN IT. BUILD IT. TRACK IT.

Stop running your projects across tools that don't talk to each other.

ONE PLATFORM, ONE LIVE RECORD
See how Linarc connects scheduling, real-time field updates, and every jobsite workflow, so a delay logged on site updates the schedule immediately, triggers the workflows it affects, and alerts the right teams before it costs you.
CONTROL WITHOUT THE ENTERPRISE TAX
You get the visibility usually reserved for enterprise firms, without the complexity or the revenue-based pricing that penalizes growth. One connected platform, priced for a growing contractor, built for the field and the office to run from the same data.