In an industry where timelines drive profits, Primavera P6 has long been the gold standard for project scheduling. Its roots in large-scale infrastructure projects earned it trust, but in 2025, that legacy comes at a cost.
Construction teams today need more than just a critical path chart. They need real-time context from the field, resource visibility by building zone, predictive risk indicators, and schedule-linked billing. And this is where P6 (and platforms built around it) begin to show their age.
P6: Powerful, But Siloed
Primavera P6 is a powerhouse for creating detailed project schedules. It’s particularly strong in complex sequencing, float analysis, and WBS planning. But it's built for planners, not crews. And that distinction matters.
Most contractors using P6 export static PDFs or Excel snapshots to communicate timelines. Field teams rarely access the live schedule, and any adjustments require a round trip through the scheduler, slowing down responses to real-world changes.
The result? A fragmented view of time. Superintendents juggle whiteboards and texts. Foremen guesstimate durations. PMs approve change orders based on outdated progress assumptions.
The Hidden Costs of Static Scheduling
Relying on P6 as a standalone system introduces delays and inefficiencies that add up quickly:
- Delayed risk response: Without real-time updates, early indicators like falling behind on rebar or waiting on material delivery don’t surface until the next scheduling cycle.
- Misaligned resources: Trade contractors can’t see updated lookahead schedules in context, leading to over- or under-staffing.
- Change order bottlenecks: Rescheduling for a delay in one zone requires planner intervention, even if the issue is local and well-understood by the field team.
- Poor visibility into progress vs. plan: Schedule updates are often retrospective, which prevents proactive project steering.
These gaps are particularly painful for mid-sized general contractors, who often lack dedicated schedulers or the IT staff necessary to integrate P6 with daily site operations.
.webp)
A New Way to Think About Scheduling: Plan, Prepare, Execute
Modern scheduling is no longer a planning-only activity. It’s a full lifecycle operation that spans planning, field coordination, and billing. Linarc addresses this through its Plan, Prepare, Execute framework.
Plan
- Collaborative scheduling: GCs and trade contractors co-develop the master schedule in a shared environment. Everyone sees the same Work Breakdown Structure (WBS), dependencies, and milestones—no more version hell.
- Milestone scheduler: Define and visualize critical handoffs, deadlines, and zone-based deliverables.
- Risk flags: Schedule-level risks (such as design delays, weather forecasts, and crew availability) can be logged and assigned mitigation plans directly within the platform.
Prepare
- 7-day crew, material, and equipment forecasts: Dynamic views help superintendents anticipate labor gaps and staging conflicts.
- Location-based sequencing: Divide the building into zones and assign tasks accordingly to improve handoff efficiency.
- Constraint management: Capture field constraints, such as inspections, cure times, or equipment access, that impact scheduling.
Execute
- Foreman-first scheduling: Crews interact with their own slice of the schedule, mapping tasks to quantities, deliverables, and completion expectations.
- Progress by quantity: Update by how many linear feet poured, not just task % complete.
- Lookahead with resourcing: Field-ready 3- and 6-week views load with crew and equipment assignments.
- Reschedule with granularity: Delay one task, one trade, one location, or the entire critical path.
- Progress-based critical path: Real-time recalculations show slippage as it happens, not two weeks later.
- G702/703 integration: Link progress to billing with audit-ready documentation.
.webp)
Why P6 Users Need a Companion or a Replacement
If you're using P6 today, it's likely feeding downstream tools, but isn't receiving live updates in return. You're managing a one-way street of information.
This makes coordination more challenging and impacts your profit margin. Teams stuck in a P6-centric workflow often spend 10-15 hours/week reconciling schedules, documents, and actuals. Worse, schedule slips don’t get noticed until they’re already critical.
With tools like Linarc, the schedule becomes interactive, real-time, and field-ready. That means fewer missed handoffs, faster decision loops, and tighter control over time-driven cost impacts.
Making the Shift
Change doesn't mean throwing P6 away overnight. For many firms, the path begins with adopting real-time tools like Linarc in tandem with P6, then gradually shifting ownership of schedules to platforms built for modern collaboration.
Mid-size GCs, in particular, benefit from this transition: faster field input, clearer accountability, and modular adoption. Instead of paying for an all-or-nothing suite, they can onboard scheduling, reporting, and field coordination in phases.
As schedule pressure grows in 2025, your tech stack needs to compress time-to-decision, not add friction. And that means thinking beyond Gantt charts to field-first coordination.