Join Our Free Webinar: Demo or Deployed
Reserve My Seat
Icon Rounded Closed - BRIX Templates
Icon Rounded Closed - BRIX Templates
Reads the Documents You Already Have

UPLOAD THE DOCUMENT. LIA DOES THE READING.

Lia reads the prime contract, the spec book, the drawing set, the schedule, the invoice, and the PO, and proposes the Linarc record each one calls for. You approve every line before it saves. No project history required. It works from the documents on your next job.

Linked records icon
Reads contracts, specs and drawings
Shop hours gauge icon
Every line shows its source page
Margin trend icon
Nothing saves until you approve
[01]// THE PROBLEM

THE JOB IS IN THE DOCUMENTS. THE DATA IS NOT.‍

Every project starts as a stack of PDFs. Someone reads the contract and retypes the terms. Someone reads 250 pages of spec book and builds the submittal log row by row. Someone tags every sheet in the drawing set. That is days of work before the first thing gets built, and it is where the first mistakes get in.

01. RETYPED TERMS

Retainage, liquidated damages, and notice periods keyed in by hand from the contract, or never entered at all.

02. THE LOG NOBODY HAS TIME FOR

A submittal missed because the requirement sat in a Division 01 table nobody got to.

03. UNTAGGED SETS

Drawing sheets filed by hand, civil mixed in with structural, and the field hunting for the right one.

04. ANSWERS IN SOMEONE’S HEAD

What is the retainage on this job? Which spec section covers the door hardware? The answer lives in a module, a folder, or a colleague.

BY THE TIME IT SURFACES, IT MAY ALREADY BE
SUBMITTALLATE
NOTICEMISSED
INVOICEKEYED WRONG
BOTTOM LINEMARGIN YOU CAN’T RECOVER
[02]// THE SHIFT

LIA READS. YOU APPROVE.

Lia is built into Linarc. It reads the documents you upload and proposes what belongs in the project record. Every proposal shows where it came from. Nothing saves until you say so.

01
UPLOAD
The contract, the spec book, the drawing set, the schedule, the invoice, the PO. The files you already have.
02
LIA PROPOSES
Fields, submittals, material lists, sheet disciplines, schedule activities, RFI drafts. Each one points back to the source page.
03
YOU APPROVE
Confirm, correct, or reject, line by line. Approved items land in the module. Rejected ones don't.
[03]// CONTRACTS

THE PRIME CONTRACT, READ ONCE

Lia reads the signed prime contract and proposes the job record from it: parties, values, dates, and terms. You approve each field before it saves.

Contract fields, extracted

Contract value, completion dates, milestones, liquidated damages, payment terms, retainage, and notice requirements, each pointing to the page it came from. Upload the signed contract and Lia checks it against the record and flags what doesn't match.

Contract drafts from a template

Generate an AIA-form contract from a mapped template, with the extracted fields filled in and the rest left as fillable fields for your team. A draft for your review and signature, not a final legal document.

One record downstream

Approved terms become the prime contract on the job. Owner-funded change orders update it. Billing and WIP read from it.

ON THE JOB

A GC signs a $1.25M AIA A101 for a site development package. Upload it. Lia proposes five fields, each tagged to the page it came from, and the PM confirms them. The notice window is on the record before the first delay, not found in the contract after it.

CONTRACT SUM
$1.25M
RETAINAGE
10%
LIQUIDATED DAMAGES
$1,500/day
PAYMENT TERMS
Net 30
NOTICE WINDOW
14 days
GOOD TO KNOW

Prime contracts at launch. Heavily marked-up or non-standard contracts still need a close human read.

See Lia on the Financials page →
[04]// SPEC BOOKS & SUBMITTALS

THE SUBMITTAL LOG, BUILT FROM THE SPEC BOOK

Lia reads the spec book cover to cover, tags every section with its CSI code, and builds the submittal log and the material list from it. Your team verifies it.

Log, drafted

Lia proposes each submittal it finds in the spec: title, type, and the CSI section it came from. Approve, edit, or reject each line. Approved lines land in the log and go to the sub whose subcontract scope covers that section.

First-pass review

When a submittal comes in, Lia checks it against what the spec section requires and flags what doesn't line up. The stamped review stays with your reviewer.

Your team verifies

Lia builds the log and the material list. Your team verifies both. Requirements hide in Division 01 prose and tables, so walk the list before it goes out.

ON THE JOB

A 260-page spec book lands for a two-story medical office build-out. Upload it. Lia proposes the log: Division 08 door hardware schedule, Division 09 finish samples, Division 23 equipment data, each tagged to its CSI section and routed to the sub that owns it. The project engineer walks the list, rejects two duplicates, adds one from a Division 01 table Lia didn’t catch, and approves the rest. The log is built from the spec, not from memory.

260
Pages in the spec book
2
Duplicates rejected
1
Added by the PE
See the submittal log in action →
[05]// DRAWINGS & RFIs

THE SET, SORTED AND READ ON UPLOAD

Upload the drawing set. Lia sorts every sheet into its discipline, indexes it from the title block, and compares a new revision to the last one. You approve the index before the field sees it.

Sorted by discipline

Architectural, structural, mechanical, electrical, civil. Lia files each sheet where it belongs when the set lands.

A sheet index on upload

Sheet numbers, titles, and scale pulled into a proposed index. Sheets carrying more than one drawing are flagged.

Revisions, compared

Upload the new set and Lia overlays it on the last one, listing what was added, removed, and changed, each located on the sheet. One click raises a pre-filled RFI from the change, or links it to an open RFI.

RFIs, drafted

Start an RFI from the sheet or ask Lia for one in the chat. Lia writes the subject and description. You review it, fix what needs fixing, and send.

ON THE JOB

Revision 3 lands Friday. Lia files 42 sheets by discipline and overlays S-201 against revision 2: a beam size changed at grid line C. The PM clicks the change, tightens the RFI Lia drafted, and sends it to the engineer.

GOOD TO KNOW

Unusual title blocks can be misfiled, so check the index before you publish the set. Lia also reads the scale and proposes quantities, which you check first.

See Lia on the drawings →
[06]// INVOICES & POs

INVOICES AND POs, READ, NOT RETYPED

Lia reads the invoice or purchase order you upload and pulls the fields into Linarc. You check them before they post.

Invoices

Upload the vendor invoice. Lia reads it and brings the fields into the record, so nobody keys the totals by hand. Used in fabrication shops as well as on the job.

Purchase orders

Upload the PO. Lia pulls the fields into Linarc, ready for the PM or contract admin to confirm.

ON THE JOB

A steel fabricator takes in 30 supplier invoices in a week. Each one is uploaded to the job. Lia reads it and brings the fields into Linarc. The project engineer checks the numbers against the delivery ticket and confirms. The invoice is in the record the day it arrives, read once, not typed twice.

30
Supplier invoices in a week
01
Uploaded to the job
02
Lia reads the fields into Linarc
03
The PE checks them and confirms
[07]// SCHEDULE

THE SCHEDULE, READ AND WATCHED

Upload the schedule and Lia pulls the activities, dates, and milestones into Linarc. Once it’s in, Lia flags what’s holding the job up and tells the people watching an item when it moves.

Schedule, extracted

Upload your project schedule in MPP, Primavera P6 (XER), or CSV format. Lia reads the activities, durations, dates, and milestones into a proposed schedule. You approve it before it becomes the baseline.

Bottlenecks, flagged

Lia flags the activity that is holding up the ones behind it, before the crew finds out on site.

Watched items, alerted

Watch a submittal, an RFI, an activity, or a piece of equipment and Lia tells you when it changes, slips, or gets answered.

ON THE JOB

The PM uploads the owner’s updated schedule. Lia reads 180 activities and milestones into a proposed schedule. The PM checks the dates against the contract milestones and approves. From then on, anyone watching the elevator inspection gets told the moment its date moves.

[08]// ASK LIA

ASK THE PROJECT A QUESTION

Lia answers questions from your own project data and keeps the thread across the project. Ask it to do something and it does it, with your sign-off before anything saves.

Your project, not the internet

"What is the retainage on this job?" "Which spec section covers the door hardware?" "What did the last RFI to the structural engineer ask?" Lia answers from the project record, as a table, a list, or a link back to the source. One search covers every module, document, and thread.

Ask it to act

Draft the RFI, update the field, log the item. Lia takes the action from the chat and shows you what changed before it saves. The better the project data, the better the answer.

Any document, summarized

Upload a file, or point at one in the project drive, and Lia summarizes what’s in it. A summary, not an extraction. Long or badly scanned files summarize less reliably.

How-to help, in the product

Ask how to do something in Linarc and get the answer where you are. Product help only; it doesn’t read your project data.

ON THE JOB

The controller is prepping a draw and asks Lia what the retainage terms are and when the last pay app went in. Lia answers from the contract and the billing record and links to both. One search, not four modules, and no waiting on the PM.

[09]// THE TERMS

WHAT LIA WILL AND WON’T DO

Plain terms. Here is where the line sits.

WILL
WON’T
WILL ·PROPOSE THE ENTRY

Every extraction arrives as a draft you read line by line before anything enters the job.

WON’T ·SAVE WITHOUT YOU

Nothing saves to the job on Lia’s output alone. You approve, or it does not land.

WILL ·CITE THE PAGE

Every proposed field points to the page it came from, so you check the source.

WON’T ·ASK YOU TO TRUST A GUESS

If Lia cannot point at a page, it does not fill the field. You check the source, not the guess.

WILL ·WORK FROM DAY ONE

No prior project history needed. Lia reads the documents on the job in front of you.

WON’T ·WAIT ON HISTORY

No training window, no back catalog to load first. The job in front of you is enough.

WILL ·GIVE YOU A FIRST PASS

Marked-up contracts and odd title blocks get a closer read. Lia builds the log. Your team verifies it.

WON’T ·SIGN OFF IN YOUR PLACE

A person signs off every time. A first pass is a first pass, never the last word.

Lia drafts. Your team signs.
NOTHING POSTS UNAPPROVED
[10]// Who It's For

BUILT FOR THE PEOPLE WHO DO THE READING

The ones who turn a stack of PDFs into a job.

sharper look-ahead
PM / Project Engineer
The spec book becomes a log to verify, not build. Submittals routed. RFIs drafted. Sets sorted on upload.
Learn more
sharper look-ahead
Contract Admin / Controller
Contract terms on the record, pointing to the page they came from. Invoices and POs read in, checked, and posted.
Learn more
sharper look-ahead
Superintendent / Field
The current set sorted by discipline, revisions compared, the question raised from the sheet, and the bottleneck flagged before it reaches the crew.
Learn more
[11]// MAKE THE CALL

SEE LIA ON YOUR DOCUMENTS

Watch Lia read a prime contract and a spec book and propose the record. Then decide.

Linarc is always evolving, enhancing, and refining our tools to help you build better. There's more on the way. We'll share more when it's ready.