Linarc vs. Oracle Primavera P6

P6 BUILDS THE SCHEDULE.
LINARC RUNS 
THE JOB.

P6 is the benchmark for planning, and it lives on a desktop away from the field and the budget. Linarc imports the plan and connects it to both.

See How Linarc Connects Your Projects →
A Primavera P6 schedule imported into Linarc and still editable, with field progress and cost to date on every task.
Linked records icon
Imports P6, MS Project, Smartsheet
Shop hours gauge icon
Editable after import
Margin trend icon
Whole team, day one
[01]// The Frame

A PLANNING TOOL ISN’T AN OPERATIONS PLATFORM

Three differences a scheduler-led GC will recognize.

Calendar grid with marked days icon
Planning vs. running

P6 plans the work. The work still has to be executed, costed, and billed somewhere else.

Gantt chart on a tablet with a pointer icon
A plan the field can touch

A schedule maintained by one specialist and shared as a file is a document. Linarc makes it a live plan the crew updates.

Stacked server layers with a no-entry badge icon
No enterprise overhead

No Oracle database, no Windows client, no multi-day certification before anyone is productive.

[02]// Feature Comparison

Primavera P6 Alternative: Where the Difference SHOWS UP

The workflows a contractor runs every day.

Workflow
Oracle Primavera P6
Linarc
What It Is
◐Planning engine
✔Operations platform
CPM Scheduling
✔The benchmark
✔Native, plus P6 import
Keeps P6 Logic after Import
–
✔Editable, connected
Field Execution
◐Restricted add-on
✔Mobile, tied to schedule
Cost and Budget
◐Separate modules
✔Connected to the schedule
Who Uses It
◐Schedulers
✔Whole team
Deployment
◐Windows plus Oracle DB
✔Cloud, web and mobile
Onboarding
◐Formal multi-day training
✔Weeks
Pricing Model
◐Per seat plus add-ons
✔Platform, users, capabilities
Best Fit
✔Megaprojects, EPC, government
✔Growing commercial contractors
✔ Full ◐ Partial ✘ Not offered–Not applicable
[03]// Keep Your P6 Logic

YOU DON’T HAVE TO THROW IT OUT

Import the schedule. Connect it to the job.

Linarc imports from P6, MS Project, and Smartsheet, keeps the CPM logic your planners built, and connects it to field progress, resources, and the budget. It stays editable after import. That last part matters: other platforms either import your P6 file as a locked view, or their P6 sync is not working today. Ask.

Coming from Microsoft Project? Project Online retired September 30, 2026. See the MS Project page.
[04]// How the Quote Is Built

PER SEAT, PLUS THE STACK AROUND IT

How each quote is put together.

Oracle Primavera P6
Linarc
THE BASE
Per-seat licensing for the schedulers
Priced on the platform, users, and capabilities you need. Not your revenue.
THE MODULES
Database, hosting, and add-ons priced around it
Onboarding included.
THE EXTRAS
Training is a formal course, typically multi-day
Lia, the Linarc assistant, is part of the platform, not a separate line.
WHEN YOU GROW
Everyone else works from an exported file
Your revenue never sets the price.
Plan set extraction, plan revision compare, spec book to submittal register, and prime contract extraction, with you approving every action.
[05]// At a Glance

DEEPER PLANNING ENGINE, OR CONNECTED OPERATION

P6 wins depth. Linarc wins connection.

Oracle Primavera P6
1/6 PROJECT CONTROLS CPM SCHEDULING FIELD EXECUTION COST AND BUDGET WHO USES IT DEPLOYMENT ONBOARDING THE PLAN, NOT THE JOB

The deepest CPM planning there is. Built for schedulers and project-controls teams. Enterprise overhead. Best for megaprojects.

Linarc
6/6 PROJECT CONTROLS CPM SCHEDULING FIELD EXECUTION COST AND BUDGET WHO USES IT DEPLOYMENT ONBOARDING PLAN AND JOB, ONE RECORD

Schedule connected to field and budget. Built for the whole team. Cloud, no database. Best for growing commercial contractors.

[06]// Who It's For

BUILT FOR THE CONTRACTOR WHO RUNS THE WORK

Two colleagues reviewing drawings and a laptop at an office desk.
Owner / COO
One connected operation, not a planning tool with everything bolted on around it.
Learn more
A project manager working at a laptop in an office.
CFO / Controller
Schedule and cost as one number, no month-end reconciliation.
Learn more
A worker in a hard hat using a tablet on a jobsite.
PM / Super
Pull look-aheads and see the critical path from the jobsite.
Learn more
[07]// Make the Call

KEEP THE RIGOR. LOSE THE  SILOS.

See how Linarc imports your P6 schedule and connects it to the field and the budget.